Are you a contractor? Get pricing for your next job. Request a quoteResources & Guides  |  Contact Us

Gutter Job Materials Checklist

By Gutter Supply Chicago

Use this gutter job materials checklist before you load the truck. A missing end cap or a short box of screws can stop a crew for hours, so list every part before the job starts.

Gutter materials checklist for a gutter installation job

Quick answer

A complete gutter job needs gutters or coil, hangers, end caps, outlets, downspouts, elbows, downspout straps, screws, sealant and, if the customer wants them, gutter guards. Measure every run and count corners and downspouts before you order.

Gutter Job Checklist

ItemWhat to count
Gutters or coilTotal length of every run, plus extra for waste
HangersOne every 24 to 36 inches, closer in heavy snow areas
End capsTwo per run (left and right)
OutletsOne per downspout
DownspoutsHeight from gutter to ground for each downspout
ElbowsUsually two or three per downspout
StrapsTwo or more per downspout
Screws and sealantEnough for every joint, end cap and outlet
Gutter guardsTotal gutter length, if included

1. Measure Every Run

Measure each roof edge that needs a gutter, note inside and outside corners, and mark where each downspout will go. Order a little extra coil or gutter length for cuts and mistakes.

2. Count the Hangers

Hanger spacing depends on climate and gutter size. In the Chicago area, many contractors place hangers every 24 inches to handle snow and ice.

3. Plan Downspouts and Fittings

Each downspout needs an outlet, elbows, straps and enough downspout length to reach the ground and turn away from the foundation.

4. Do Not Forget the Small Parts

Screws and sealant, connectors and gutter guards are easy to forget and hard to find on short notice.

5. Send One List

Send the whole checklist to Gutter Supply Chicago in one quote request. We reply the same day and deliver to job sites across our service area. No minimum order.

For roofing and drainage best practices, see the National Roofing Contractors Association.

Frequently Asked Questions

How far apart should gutter hangers be?

Typically every 24 to 36 inches. In areas with heavy snow, such as Chicago, many contractors use 24 inches or closer.

How many elbows does a downspout need?

Most downspouts need two or three elbows: one or two at the top to reach the wall and one at the bottom to turn water away from the house.

How much extra gutter material should I order?

Add a small margin to the measured length to cover cuts, corners and mistakes.

Can I send this checklist for a quote?

Yes. Send your list to Gutter Supply Chicago and we reply the same day with pricing and delivery.

Ready to Order for Your Next Job?

Send your list and get a same-day quote with job-site delivery.

Request a Quote   Call (312) 823-7355